Thursday, October 13, 2011

Finished Construction on the Kitchen

They are coming back later tonight to put the sealer on the tile and the trim work up around the floor. (and on our own we will go get new lights for the ceiling) Otherwise, FINISHED. Now I can clean the dust from the entire house. haha. I absolutely love my new kitchen. I cant find any good pictures of before. On the left side at the end of that counter top, was an island that came out. The refrigerator was one cupboard over to the right of the stove and cupboard and there was a door way where the refrigerator is now. We used existing cupboard to cut down on cost. My main hope was to open it up and have more room for my table (which will go somewhere in the middlish of the room, once the tile is sealed) The bid was that it was going to take 3 weeks. It took 2 weeks to the day. The best contractors EVER! Give them a call, they can even possibly go out of town. Kevin Walk 253 686 0020 (gotta love "K" names)

No comments: